Robert Pattinson Stars In “Mickey 17,” Directed By Bong Joon Ho—In Cinemas January 2025

Witness the artistry of Bong Joon Ho and the talent of Robert Pattinson when "Mickey 17" premieres in cinemas.

Philippine Gross International Reserves At USD106.8 Billion As Of End December 2024

The latest report indicates that the Philippines' gross international reserves reached USD106.84 billion at the end of 2024.

Cebu Partners With Fujian School To Train Doctors On Chinese Medicine

Cebu's partnership with Fujian School aims to enrich local doctors' understanding of alternative medicine.

Jel Rey Feels At Ease In New Single “Naiilang”

Jel Rey's musical journey continues with "Naiilang," highlighting the ease found in true companionship.

NHA Allocates P20-M For Zambo Footbridge Project

By Society Magazine

NHA Allocates P20-M For Zambo Footbridge Project

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The National Housing Authority (NHA) has allocated PHP20 million to build a concrete footbridge for those living in houses on stilts in one of the siege-affected barangays.

The recipient of the concrete footbridge project is Barangay Rio Hondo, one of the five most-affected barangays in the 2013 Zamboanga siege.

Rodrigo Pagotaisidro, City Housing and Land Management Division chief, said Saturday they are just waiting for the NHA to download the funds to the City Engineer’s Office, which is in charge of the implementation of the project.

The concrete footbridge will replace the existing wooden footbridge leading to the houses on stilts in Barangay Rio Hondo.

Pagotaisidro said the construction of a concrete footbridge is imperative to avert a repeat of an accident wherein government and NHA officials fell into the murky water as the wooden bridge collapsed.

The officials, Mayor Maria Isabelle Climaco-Salazar, then 1st district Congressman Celso Lobregat, Negros Occidental Congressman Alfredo Benitez, NHA and other officials were conducting an inspection on April 26, 2018, when the wooden footbridge collapsed.

Pagotaisidro said the City Engineer’s Office will start the work once the NHA will release the PHP20 million allocation.

Meanwhile, he said the wooden footbridge will be rehabilitated by the City Engineer’s Office while awaiting the release of the funds. (PNA)