PCG Awards Purchase Deal For 40 Patrol Boats To French Firm

A contract has been awarded to French firm OCEA for the provision of 40 patrol boats to the Philippine Coast Guard, strengthening coastal operations.

Quezon City Urges Schools To Adopt Sustainable Practices Amid Climate Crisis

The Quezon City government believes schools should integrate environmental sustainability into everyday operations for a better future.

Negros Occidental Braces For Thousands At Holy Week Pilgrimage Sites

Communities in Negros Occidental are coming together to offer peace and reflection to thousands of pilgrims this Lenten season.

Sipalay Accommodations 90% Booked For Holy Week Break

With the Holy Week nearing, Sipalay City is seeing a high demand for beach accommodations.

NHA Allocates P20-M For Zambo Footbridge Project

By Society Magazine

NHA Allocates P20-M For Zambo Footbridge Project

12
12

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The National Housing Authority (NHA) has allocated PHP20 million to build a concrete footbridge for those living in houses on stilts in one of the siege-affected barangays.

The recipient of the concrete footbridge project is Barangay Rio Hondo, one of the five most-affected barangays in the 2013 Zamboanga siege.

Rodrigo Pagotaisidro, City Housing and Land Management Division chief, said Saturday they are just waiting for the NHA to download the funds to the City Engineer’s Office, which is in charge of the implementation of the project.

The concrete footbridge will replace the existing wooden footbridge leading to the houses on stilts in Barangay Rio Hondo.

Pagotaisidro said the construction of a concrete footbridge is imperative to avert a repeat of an accident wherein government and NHA officials fell into the murky water as the wooden bridge collapsed.

The officials, Mayor Maria Isabelle Climaco-Salazar, then 1st district Congressman Celso Lobregat, Negros Occidental Congressman Alfredo Benitez, NHA and other officials were conducting an inspection on April 26, 2018, when the wooden footbridge collapsed.

Pagotaisidro said the City Engineer’s Office will start the work once the NHA will release the PHP20 million allocation.

Meanwhile, he said the wooden footbridge will be rehabilitated by the City Engineer’s Office while awaiting the release of the funds. (PNA)